Greater Laggan Area Key characteristics

Operator
TotalEnergies

Operator

Share
20%

INEOS' share

Depth
600m

Water depth

Started
2016

Production start date

Greater Laggan Area

The Greater Laggan Area consists of four producing gas fields Laggan, Tormore, Edradour and Glenlivet.  The gas is transported to the Shetland Gas Plant via a 143km long subsea tie-back, the longest subsea tie-back in the UK.

20180327_5.png 20180327_6.png

Breagh Key Characteristics

Operator
INEOS

with a 70% share

Partner
ONE-Dyas

(Oranje Nassau Energy)

Depth
62m

Water depth

Logistics
20"

Pipeline constructed to link field with Teesside Gas Processing Plant

Breagh

The Breagh field is one of the largest natural gas fields developed in the entire southern British North Sea. First gas was achieved in October 2013 –  only just over two years after approval by the British authorities.

The field is located in the UK sector of the Southern North Sea, about 65 kilometers off the coast of northeast England.

breagh.jpeg

Clipper South Key Characteristics

Operator
INEOS

with a 75% share

Partner
25%

Managed by Spirit Energy

Platform

Single wellhead steel structure incl. 40 person quarters for well intervention support

Horizontal Wells
4

Drilled with 4-8 hydraulic fracs per well

Clipper South

INEOS Oil & Gas UK operate the unmanned Clipper south field located about 100 kilometers east of the Lincolnshire coast. The wells are controlled the Lincolnshire Offshore Gas Gathering System platform.

In 2013 the first Clipper South well came on stream at initial rates of 1.2 million cubic meters per day. The gas is located in a tight Permian age Rotliegend reservoir which contains approximately 13.4 billion normal cubic meters of gas in place.

dea_clipper_south_uk.jpg